CORMAC in association with Marini UK offer an extensive range of asphalt plants in three product ranges:
Top Tower - this top of the range plant is available in 2 configurations with outputs ranging from 160 tonnes per hour to 360 tonnes per hour.
Top Tower Gallery (click to view a larger image)