

Marini Asphalt Plant Range
CORMAC in association with Marini UK offer an extensive range of asphalt plants in three product ranges:
Top Tower - this top of the range plant is available in 2 configurations with outputs ranging from 160 tonnes per hour to 360 tonnes per hour.
UltiMAP - a versatile and modular batch mix plant with a throughput range of 60 to 330 tonnes per hour.
Roadstar - the mobile plant that allows production to be kept close to you work site with throughput ranging from 60 to 200 tonnes per hour.






